Composite cross-arm for high-voltage transmission infrastructure
Developed from concept through to pilot installation on Scottish transmission network. Project involved full-scale prototype development, FEA analysis, destructive testing, and collaboration with National Grid and University of Manchester.
:quality(80):focal(733x195:734x196)/f/287691250754731/1280x720/fb8084c3e0/10-abstract-blue.jpg)
SolidWorks rendering of composite cross-arm assembly showing structural members and electrical insulation sheds
:quality(80)/f/287691250754731/640x513/765bfeb7c2/crossarm-testing-broken-wire.jpeg)
FEA stress analysis of test rig under broken wire loading conditions, identifying high stress concentrations in joint connections
:quality(80)/f/287691250754731/661x513/4313a0f367/crossarm-testing-broken-wire-redesign.jpeg)
Modified test rig design with reinforcement plates, showing reduced stress concentrations after FEA optimisation
Full-scale test rig for validating cross-arm performance under multi-tonne loading
:quality(80)/f/287691250754731/1152x765/5d31a8c1f8/crosasarm-electrical-testing.jpg)
High-voltage electrical testing of composite cross-arm validating insulation performance in collaboration with University of Manchester
:quality(80)/f/287691250754731/1475x903/bd03f4f863/crossarm-solidworks-assembly-for-installation.jpeg)
SolidWorks assembly view showing detailed component design for manufacture and installation planning
Installation team preparing cross-arm for deployment on transmission line in highest wind conditions in UK
Lifting composite cross-arm into position on transmission tower during pilot installation in Scotland
Full-scale prototype installed on transmission infrastructure with embedded sensors for long-term mechanical feasibility monitoring
Installed prototype demonstrating progression from initial concept design through to operational pilot demonstration